You are on PERI's international website. Click here to switch to PERI USA. Click here to view all PERI websites.

St. Martins Therme & Lodge, Austria

Info projecten

Ligging: Frauenkirchen, Oostenrijk

Hot springs resort with adjacent four-star hotel on Neusiedler Lake

Vereisten

  • floor slabs with wall thicknesses up to 55 cm and room heights of 5 m
  • fabrication of shear walls of up to 7m at heights up to 16 m
  • construction time schedule only 9 months

Klant

HABAU Hoch- und Tiefbauges. m.b.H., Perg

Voordeel klant

  • short construction time due to fast erection times
  • moving of complete scaffolding units by crane
  • implementation of complicated layouts with little effort
Manfred Lehner, Manfred Lehner, Statement
Manfred Lehner
Senior foreman

The PERI UP shoring system convinced us by its low individual weight and utmost stability. This helps us to achieve fast erection times as well as the moving of whole scaffolding units by crane. Also the decision in favour of SKYDECK and RUNDFLEX was good. Both are simple and flexible systems and with them, you can implement even difficult layout geometries without much effort.

PERI oplossing

  • SKYDECK slab formwork with drophead and MULTIPROP slab props for fast handling of material with a reduced total quantity
  • shoring system from PERI UP modular-type scaffolding and HD 200 heavy-duty prop
  • for high load concentrations, several standards were bundled together using short 25-centimetre long ledgers to form additional frames, without more time-consuming scaffolding tube couplers
  • versatile use of PERI UP as shoring, reinforcement scaffold and staircase