You are on PERI's international website. Click here to switch to PERI USA. Click here to view all PERI websites.

Tošanovice-Žukov Bridge, Czech Republic

Info projecten

Ligging: Ostrava, Tsjechië

Design: steel composite bridge
Length: 720 m

Vereisten

The strut axes open out from 6.50 m to 9.00 m in the centre of the bridge.

Klant

Metrostav a.s., Division 4, Prague

Voordeel klant

  • flexible connecting possibilities for steel walers, scaffold tubes, heavy-duty spindles and tie rods
  • can be adapted to various main beam spacings
Martin Šimek, Site Manager
Martin Šimek
Site Manager

The erection of steel composite bridges is considerably easier and much faster with the PERI formwork carriage construction.

PERI oplossing

Two modular formwork carriages from the VARIOKIT system

PERI systemen ter plaatse