Puente de La Pepa, Spain

Info projecten

Ligging: Bahia de Cádiz, Spanje

  • construction: cable-stayed bridge
  • total length: 3.2 km
  • span of main bay: 540 m
  • two pylons at a height of 190 m
  • six-lane road at a height of 69 m

Vereisten

  • different construction sections with pylons, pillars and superstructure
  • changing layout form of the pylons from hexagonal to trapezoid
  • continuous cross-section change with curvatures on all sides
  • 47 m wide pylon enlargement with high concreting loads

Klant

UTE Puente de Cádiz:
Dragados S.A., Madrid; F.P.S. S.A., Madrid

Voordeel klant

  • simplification of the construction sequences with only one formwork and scaffolding partner
  • integrated work levels
  • optimal accessibility
  • mostly utilisation of rentable standard systems
Puente de la Pepa, Cadiz - Victor M. Jiménez Aguadero, Construction Manager
Victor M. Jiménez Aguadero
Construction Manager

We were able to define a formwork concept for this bridge project together with the PERI engineers which is based on the experience from numerous projects that have been carried out so far.

PERI oplossing

  • accurate prefabrication of the customised VARIO elements
  • steel latticed framework as specific solution for the fabrication of the enlargement area